Road Cameras Courtesy of CDOT

Choose a location to see the available camera feeds for that area.

Loading Cameras...

Current Road Updates

summit countyDam Road to Close Tuesday & Wednesday

 Dam Road Closed for Rock Scaling and Removal Tuesday 11/4/2014 starting at 8AM. Road will remain closed through Wednesday 11/5/2014, re-opening at 4PM. Rec Path will be open, but road closed to bicycle traffic.

cdot.jpg

 Construction/Maintenance Work:

CO 9 NB/SB in Breckenridge between Agape Church & Tiger Road (through October 2014)

7A to 7P Mon - Fri... One lane open in each direction for paving and traffic signal work - delays possible.

I-70 EB east of Eisenhower/Johnson tunnels (between mile markers 215 & 228)   Through October 2014.

8:00 AM - 4:00 PM Monday - Friday the left lane and left shoulder will be closed for guardrail repair.

I-70 EB/WB Between Empire & Downieville (mm 230 & 237) through November 2014

4:00 AM - 3:00 PM Monday through Wednesday, a single lane closed in each direction on I-70 for barrier installation and retaining wall construction.

I-70 EB/WB between Dotsero & Vail (mm 177 & 154) through October 2014 

6:30 AM - 5:00 PM Monday through Friday there will be single lane and shoulder closures for excavation, drilling operations and fiber installation. Delays possible.

Weekly Twin Tunnels traffic Advisory:

traffic stops due to blasting/scaling may occur.  Listen to Krystal 93 for updates on times.

 

 

BRECK-TOWN.Breckenridge Beautifies

 At the encouragement of the public over the past few years, the Breckenridge Town Council recently approved a plan to improve the north entrance into town. The project entails re-landscaping the existing roundabout and median on SH 9 from Valley Brook Road to the roundabout at the north end of Park and Main. Phase I involves demolishing the existing roundabout landscape inside the curb and gutter and installing a portion of the landscaping.  The overall project will provide colored stamped concrete, banner/hanging basket poles, electrical outlets, irrigation and electrical conduit and stone wall work. Phase I is expected to go through the end of October, and Phase II is slated for Spring 2015.  Drivers should expect minor delays as lane closures will take place periodically during the project phases.

 

 

road closed.jpgSeasonal Road Closures

 CO 5 Mt Evans Rd closed from Echo Lake to the top until next spring.

 